Colchester

Our scope of works on this site was drainage, ducting and RC works.

Works began with the removal of the existing concrete yard to allow the installation of the new drainage and tanks.

As works progressed externally, the internal RC works began with the dock leveler bases and walls before the installation of the void filler to allow for the raised floor to be poured.

As all drainage works were completed externally, we began concreting the yard in bays. Once this was finished, the final works to be completed was the
installation of crash barriers and bollards internally and externally as well as all external line marking.